Create and Update an Unresourced Project using Elecosoft (Asta) Powerproject Version 17
by Paul E Harris
9780648635529
$47.90
Enter your e-mail address to be notified when product is in stock
Notify Me!
Seller Info
bookpod (3945)
Seller Accepts
Shipping Policy
Orders are generally dispatched the following business day. Standard shipping times are usually 1-3 business days for domestic and 5-10 days for international.
Return Policy
Money Back / Exchange within 14 days
Description
Create and Update an Unresourced Project using Elecosoft (Asta) Powerproject Version 17
 - 2-day training course handout and student workshops - Version 16 - by Paul E Harris
- Please note that this is a print-on-demand title and orders will take an additional 5 days to print prior to despatch -
 
Product details
Paperback: 216 pages
Publisher: Eastwood Harris (2024)
ISBN: 9780648635529
Trim size: 280 x 216 mm
 
Synopsis   
All scheduling software is difficult to learn for a number of reasons. None have the optimal settings when installed and templates, views and default options need to be adjusted to obtain the best possible performance. Usually the Help files do not connect the user to real life situations and do not explain the practical use of functions. Furthermore, there are many flicks and switches with obscure names that are difficult to understand or decide what they do or which are important. These issues make learning the software very difficult without a comprehensive guide written by an experienced user. Investing in a book written by Paul E Harris will address all these issues and allow you to setup the software properly and understand all the obscure functions letting you become productive more quickly and enhance your career opportunities and salary with a solid understanding of the software.

This book is designed as a student handout for a two-day training course and may also be used as a self-teach book. This course objectives are to teach participants:
• The user interface,
• How to create a projects,
• Scheduling projects without resources,
• Filters, Views, Sorts and Printing,
• Creating and assigning a baseline and
• Updating an un-resourced project.

Most chapters are reinforced by student workshops.

This book is written by an experienced scheduler, who has used the software at the sharp end of projects and is not a techo. It draws on the author's practical experience in using the software in a wide variety of industries. It presents workable solutions to real day to day planning and scheduling problems and contains practical advice on how to set up the software and import data.



About the Author
Paul Harris holds an Honours Degree in Civil Engineering obtained in the UK and is a Certified Cost Engineer through AACE International, a PRINCE2TM Registered Practitioner and a “Managing Successful Programmes” Registered Practitioner. He has worked in the project controls industry for a number of years and has assisted many companies in a range of industries to set up and run project controls systems. His Melbourne, Australia based company, Eastwood Harris Pty Ltd, offers project controls consulting and training services worldwide with a strong focus on Microsoft Project and Primavera planning software.

 
 
Reviews (0)
Currently there are no reviews for this product.
Questions
Currently there are no questions for this product.
<-- Digital window verification 001 -->